28 Walker Development has secured its first tenant and will soon break ground on a new Canton office building that will be constructed entirely with heavy wood timber materials, the first of its kind in downtown Baltimore City.
28 Walker Development has secured its first tenant and will soon break ground on a new Canton office building that will be constructed entirely with heavy wood timber materials, the first of its kind in downtown Baltimore City.
Watch the video to learn how you can access industry leading CRE news and the data analytics you need to drive success.
This news story is available exclusively to CoStar subscribers.
Ready to Learn More?
Sign Up For a Personalized Demo.
Sign Up For a Demo To Learn More.
Already A Subscriber? Sign In
4010 Boston St, Baltimore, MD
Principal, NAI KLNB